Skip to content
IgshpaIgshpa
  • Home
  • Pages
    • About IGSHPA
  • Courses
    • Geothermal Energy and Ground Source Heat Pumps – An Overview
    • GSHP Residential Service Technician Online Training Course – $400 Member Price*
    • GHSP Residential Installer Online Training Course – $400 Member Price*
    • Prerequisite Modules – Residential/Light Commercial GHXI (Ground Heat Exchanger Installer) – $345 Member Price*
    • Full Course – Residential/Light Commercial GHXI (Ground Heat Exchanger Installer) Course – $895 Member Price*
    • DOE Energy Skilled Recognition Courses – Member Price
    • DOE Energy Skilled Recognition Courses – Non-Member Price
    • Selecting a Ground Source Heat Pump Team
  • Contact
    • Contact Us
  • Shop
  • My Account
IgshpaIgshpa
  • Home
  • Pages
    • About IGSHPA
  • Courses
    • Geothermal Energy and Ground Source Heat Pumps – An Overview
    • GSHP Residential Service Technician Online Training Course – $400 Member Price*
    • GHSP Residential Installer Online Training Course – $400 Member Price*
    • Prerequisite Modules – Residential/Light Commercial GHXI (Ground Heat Exchanger Installer) – $345 Member Price*
    • Full Course – Residential/Light Commercial GHXI (Ground Heat Exchanger Installer) Course – $895 Member Price*
    • DOE Energy Skilled Recognition Courses – Member Price
    • DOE Energy Skilled Recognition Courses – Non-Member Price
    • Selecting a Ground Source Heat Pump Team
  • Contact
    • Contact Us
  • Shop
  • My Account

Choose Your Objective

  • Home
  • Quiz
  • Choose Your Objective
Breadcrumb Abstract Shape
Breadcrumb Abstract Shape
Breadcrumb Abstract Shape

Choose Your Objective

  • 17 Jan, 2024
  • Com 0

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.

Time limit: 0

Quiz Summary

0 of 50 Questions completed

Questions:

Information

You have already completed the quiz before. Hence you can not start it again.

Quiz is loading…

You must sign in or sign up to start the quiz.

You must first complete the following:

Results

Quiz complete. Results are being recorded.

Results

0 of 50 Questions answered correctly

Your time:

Time has elapsed

You have reached 0 of 0 point(s), (0)

Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)

Categories

  1. Not categorized 0%
  1. Review
  2. Answered
  3. Correct
  4. Incorrect
  1. Question 1 of 50
    1. Question

    A double roll-back bead is associated with this properly performed type of heat fusion for HDPE pipe?

    Correct
    Incorrect
  2. Question 2 of 50
    2. Question

    According to IGSHPA Standards and ASHRAE Guidelines, standards, after the completion of the drilling, pipe insertion, and grouting of a vertical heat exchanger installed for a thermal conductivity test, the hole needs to “rest” for what period of time before beginning the test?

    Correct
    Incorrect
  3. Question 3 of 50
    3. Question

    During the drilling, grouting, and pipe insertion phase of a project, which of the following is most accurate in helping an inspector verify the depth of the holes that have been drilled?

    Correct
    Incorrect
  4. Question 4 of 50
    4. Question

    Fouling of the heat pump’s coaxial heat exchanger resulting in routine cleaning is most common with which of the following outside heat exchangers?

    Correct
    Incorrect
  5. Question 5 of 50
    5. Question

    Geothermal Inspectors/Regulators were one of the Ground Source Heat Pump job classifications identified by a GHPC study conducted under a DOE grant as part of:

    Correct
    Incorrect
  6. Question 6 of 50
    6. Question

    How long can a vertical borehole that penetrates more than one aquifer be left open without grouting according to IGSHPA standards?

    Correct
    Incorrect
  7. Question 7 of 50
    7. Question

    If the static design pressure of a ground loop heat exchanger is not known, what pressure should be applied during the pressure testing of HDPE or PEX piping provided it does not exceed the pipe rating?

    Correct
    Incorrect
  8. Question 8 of 50
    8. Question

    In order to perform an accurate pressure test, which of the following must be done first?

    Correct
    Incorrect
  9. Question 9 of 50
    9. Question

    In socket fusion, which of the following ensures that the fitting is not pushed too far onto the pipe after the heat soak phase?

    Correct
    Incorrect
  10. Question 10 of 50
    10. Question

    The IGSHPA Standard for flushing velocity to remove air and most small debris from a GLHE is:

    Correct
    Incorrect
  11. Question 11 of 50
    11. Question

    The IGSHPA standard for the minimum duration of a pressure test is:

    Correct
    Incorrect
  12. Question 12 of 50
    12. Question

    To achieve equal flow in each heat exchanger connected in a circuit, which of the following piping configurations is necessary?

    Correct
    Incorrect
  13. Question 13 of 50
    13. Question

    Using Table 4.26 in the IGSHPA Residential and Light Commercial manual, what flow rate is required for flushing at 2 fps for 1” DR-11 pipe?

    Correct
    Incorrect
  14. Question 14 of 50
    14. Question

    Using the same table, what flow rate would be required to flush a circuit of 3 boreholes made up of 1” DR-11 pipe downhole?

    Correct
    Incorrect
  15. Question 15 of 50
    15. Question

    What do the IGSHPA standards recommend to do with a vertical heat exchanger that is found to have a leak?

    Correct
    Incorrect
  16. Question 16 of 50
    16. Question

    What is a tremie line?

    Correct
    Incorrect
  17. Question 17 of 50
    17. Question

    What is an inspector looking for during a flow test which would indicate the possibility of kinked pipes downhole?

    Correct
    Incorrect
  18. Question 18 of 50
    18. Question

    When an inspector observes sink holes, or grout levels in the boreholes that are below trench level, what should be done?

    Correct
    Incorrect
  19. Question 19 of 50
    19. Question

    When compared to a horizontal heat exchanger, which of the following is not one of the advantages of a GSHP that employs vertical heat exchangers in the design?

    Correct
    Incorrect
  20. Question 20 of 50
    20. Question

    Which of the following antifreezes is considered to be a fire risk in its pure state?

    Correct
    Incorrect
  21. Question 21 of 50
    21. Question

    Which of the following antifreezes is not recommended by IGSHPA?

    Correct
    Incorrect
  22. Question 22 of 50
    22. Question

    Which of the following are not typically the responsibilities of a code and/or quality Geothermal Inspector?

    Correct
    Incorrect
  23. Question 23 of 50
    23. Question

    Which of the following ground heat exchangers would typically provide the most consistent water temperatures throughout the year?

    Correct
    Incorrect
  24. Question 24 of 50
    24. Question

    Which of the following heat fusion processes requires both the inside of the fitting and the outside of the pipe to be heated to a molten state?

    Correct
    Incorrect
  25. Question 25 of 50
    25. Question

    Which of the following is currently in the IGSHPA standards as an acceptable material for a ground heat exchanger?

    Correct
    Incorrect
  26. Question 26 of 50
    26. Question

    Which of the following is important to an inspector concerned with the thermal performance of the ground heat exchanger?

    Correct
    Incorrect
  27. Question 27 of 50
    27. Question

    Which of the following is not an advantage of keeping an accurate as-built drawing of the ground heat exchanger during construction?

    Correct
    Incorrect
  28. Question 28 of 50
    28. Question

    Which of the following is not an economic benefit of a GSHP system?

    Correct
    Incorrect
  29. Question 29 of 50
    29. Question

    Which of the following is the most important reason to remove rocks from the horizontal trenches of a ground heat exchanger?

    Correct
    Incorrect
  30. Question 30 of 50
    30. Question

    Which of the following is the proper temperature range for performing butt fusion?

    Correct
    Incorrect
  31. Question 31 of 50
    31. Question

    Which of the following should an inspector be aware of during a site visit to get a feel for the quality of the work of the installing contractor?

    Correct
    Incorrect
  32. Question 32 of 50
    32. Question

    Which of the following would have the highest pressure rating assuming the same ambient temperature for each?

    Correct
    Incorrect
  33. Question 33 of 50
    33. Question

    Why are corrosion inhibitors often required in GSHP piping systems?

    Correct
    Incorrect
  34. Question 34 of 50
    34. Question

    A borehole that is being abandoned, or taken out of use, should be flushed and pressure tested as part of the decommissioning process.

    Correct
    Incorrect
  35. Question 35 of 50
    35. Question

    A refractometer can be used to verify the propylene glycol antifreeze concentration in the GSHP system solution.

    Correct
    Incorrect
  36. Question 36 of 50
    36. Question

    A soil thermal conductivity test is necessary for the correct calculation of a horizontal ground loop heat exchanger.

    Correct
    Incorrect
  37. Question 37 of 50
    37. Question

    A test hole that is not used in the final project does not need to be “decommissioned” as long no antifreeze or chemicals were used in the solution used for testing.

    Correct
    Incorrect
  38. Question 38 of 50
    38. Question

    An inspector does not need to be concerned with the grouting of vertical boreholes located in wet, sandy formations.

    Correct
    Incorrect
  39. Question 39 of 50
    39. Question

    Cementitious grouts are not approved by IGSHPA due to their tendency to shrink and because of the heat that is generated during the curing process.

    Correct
    Incorrect
  40. Question 40 of 50
    40. Question

    For HDPE pipe, the higher the DR (Dimension Ratio) number, the higher the pressure rating at a given temperature.

    Correct
    Incorrect
  41. Question 41 of 50
    41. Question

    Geothermal valve vaults constructed of HDPE that are water-tight do not need to comply with OSHA confined space regulations.

    Correct
    Incorrect
  42. Question 42 of 50
    42. Question

    HDPE and PEX pipe should be filled with water and tested before being inserted into the borehole.

    Correct
    Incorrect
  43. Question 43 of 50
    43. Question

    Heat fusion equipment requires periodic calibration in the field and an inspector may want to inquire that this is being done and documented by the installer.

    Correct
    Incorrect
  44. Question 44 of 50
    44. Question

    In a northern climate antifreeze is not required in a system if the field is designed to supply water temperatures to the system (EWT’s) of greater than or equal to 40 degrees F year round at a standard flow rate of 3 GPM/ton.

    Correct
    Incorrect
  45. Question 45 of 50
    45. Question

    In large commercial GSHP systems, the inside piping and the outside piping should be flushed independently of each other before system startup.

    Correct
    Incorrect
  46. Question 46 of 50
    46. Question

    Stab-type fittings are an acceptable method of joining buried PEX pipe according to IGSHPA Standards.

    Correct
    Incorrect
  47. Question 47 of 50
    47. Question

    The above ground piping of a GSHP does not ever need to be insulated.

    Correct
    Incorrect
  48. Question 48 of 50
    48. Question

    The advantage of valve vaults constructed from concrete is they are not buoyant and will not float before being backfilled.

    Correct
    Incorrect
  49. Question 49 of 50
    49. Question

    Valve vaults located outside of a building’s walls reduce the amount of mechanical space required for the ground heat exchanger piping entry points and the valve manifolds.

    Correct
    Incorrect
  50. Question 50 of 50
    50. Question

    When done properly, the heat fusion process for HDPE results in a joint that is as strong as the pipe itself.

    Correct
    Incorrect

Search

Categories

  • Blogs
  • Directory
  • Job Board
  • News

Categories

  • Blogs (8)
  • Directory (144)
  • Job Board (6)
  • News (14)

Tags

$10M Available 2025 conference annual conference C448 co-op training Connecticut CSA Design and Installation Standard District of Columbia electric co-op Engineer gaoi GAOI 2025 Georgia Geothermal Heat Pump geothermal technology Ground Source Heat Pump GSHP GSHP Standard IGSHPA IGSHPA/GAOI IGSHPA 2025 IGSHPA conference Illinois Indiana Large Scale Thermal Projects Maine Massachusetts Michigan New Hampshire New York North Carolina Ohio Pennsylvania Practice Leader Public Review Rhode Island Senior Mechanical Engineer Service Technician South Carolina Tennessee train-the-trainer Vermont Virginia West Virginia

Archives

  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • May 2023
Copyright International Ground Source Heat Pump Association. All Rights Reserved.
IgshpaIgshpa

Confirmation

You are leaving the Exam. Do you want to continue to exit?