Skip to content
IgshpaIgshpa
  • Home
  • Pages
    • About IGSHPA
  • Courses
    • Geothermal Energy and Ground Source Heat Pumps – An Overview
    • GSHP Residential Service Technician Online Training Course – $400 Member Price*
    • GHSP Residential Installer Online Training Course – $400 Member Price*
    • Prerequisite Modules – Residential/Light Commercial GHXI (Ground Heat Exchanger Installer) – $345 Member Price*
    • Full Course – Residential/Light Commercial GHXI (Ground Heat Exchanger Installer) Course – $895 Member Price*
    • DOE Energy Skilled Recognition Courses – Member Price
    • DOE Energy Skilled Recognition Courses – Non-Member Price
    • Selecting a Ground Source Heat Pump Team
  • Contact
    • Contact Us
  • Shop
  • My Account
IgshpaIgshpa
  • Home
  • Pages
    • About IGSHPA
  • Courses
    • Geothermal Energy and Ground Source Heat Pumps – An Overview
    • GSHP Residential Service Technician Online Training Course – $400 Member Price*
    • GHSP Residential Installer Online Training Course – $400 Member Price*
    • Prerequisite Modules – Residential/Light Commercial GHXI (Ground Heat Exchanger Installer) – $345 Member Price*
    • Full Course – Residential/Light Commercial GHXI (Ground Heat Exchanger Installer) Course – $895 Member Price*
    • DOE Energy Skilled Recognition Courses – Member Price
    • DOE Energy Skilled Recognition Courses – Non-Member Price
    • Selecting a Ground Source Heat Pump Team
  • Contact
    • Contact Us
  • Shop
  • My Account

Common Fitness Myths Debunked

  • Home
  • Quiz
  • Common Fitness Myths Debunked
Breadcrumb Abstract Shape
Breadcrumb Abstract Shape
Breadcrumb Abstract Shape

Common Fitness Myths Debunked

  • 17 Jan, 2024
  • Com 0

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.

Time limit: 0

Quiz Summary

0 of 20 Questions completed

Questions:

Information

You have already completed the quiz before. Hence you can not start it again.

Quiz is loading…

You must sign in or sign up to start the quiz.

You must first complete the following:

Results

Quiz complete. Results are being recorded.

Results

0 of 20 Questions answered correctly

Your time:

Time has elapsed

You have reached 0 of 0 point(s), (0)

Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)

Categories

  1. Not categorized 0%
  1. Review
  2. Answered
  3. Correct
  4. Incorrect
  1. Question 1 of 20
    1. Question

    When deciding the recommended circuit breaker size and supply power wire for the unit, what manufacturer supplied resources should you reference for the most up to date information?

  2. Question 2 of 20
    2. Question

    For 240V single phase installations, what electrical control device within the GSHP unit should be verified before applying line voltage power to the unit?

  3. Question 3 of 20
    3. Question

    When preparing for a pre-startup review on the equipment installation what manufacturer supplied document should be utilized?

  4. Question 4 of 20
    4. Question

    Where would you install a trap in a line set when necessary?

  5. Question 5 of 20
    5. Question

    Once the closed loop piping system has been properly purged of air, debris and pressurized on a system with a pressurized flow center, which item will have the greatest impact on the system seasonal operating pressure?

  6. Question 6 of 20
    6. Question

    What conditions make the use of antifreeze necessary on a closed loop application?

  7. Question 7 of 20
    7. Question

    Before installation of an Open Loop/Well Water application system what water related items should be rigorously evaluated?

  8. Question 8 of 20
    8. Question

    If using a premixed alcohol as the HTF (Heat Transfer Fluid) with excellent quality potable water, what is the most important item to be considered and verified before bringing it into the building?

  9. Question 9 of 20
    9. Question

    When installing a forced air split system GSHP with a fossil fuel heating system what type of room thermostat is required?

  10. Question 10 of 20
    10. Question

    When installing a dual fuel split system GSHP with fossil fuel furnace what is the most important requirement?

  11. Question 11 of 20
    11. Question

    When installing electric supplementary/auxiliary heaters, what item is key to proper heater performance?

  12. Question 12 of 20
    12. Question

    Why is dry nitrogen required when brazing copper refrigerant piping?

  13. Question 13 of 20
    13. Question

    Packaged water-to-air GSHPs require a connection to the condensate drain to allow condensate water to drain during the cooling mode. During installation, piping/trap considerations are as follows:

  14. Question 14 of 20
    14. Question

    In heating dominant climates,

  15. Question 15 of 20
    15. Question

    When connecting a 24VAC electronic air cleaner to a packaged water-to-air GSHP,

  16. Question 16 of 20
    16. Question

    During startup performance checks of a packaged water-to-air GSHP unit,

  17. Question 17 of 20
    17. Question

    During setup/startup on a GSHP unit with a desuperheater (domestic hot water) option, the desuperheater pump needs to be

  18. Question 18 of 20
    18. Question

    During installation of a GSHP unit in a new build construction or a retrofit with building construction occurring at the same time,

  19. Question 19 of 20
    19. Question

    In addition to other components recommended by the manufacturer, open loop/well water applications should always include which of the following?

  20. Question 20 of 20
    20. Question

    At startup time for a new installation of a GSHP unit, the following tools are critical in determining heat pump performance:

Search

Categories

  • Blogs
  • Directory
  • Job Board
  • News

Categories

  • Blogs (8)
  • Directory (144)
  • Job Board (6)
  • News (14)

Tags

$10M Available 2025 conference annual conference C448 co-op training Connecticut CSA Design and Installation Standard District of Columbia electric co-op Engineer gaoi GAOI 2025 Georgia Geothermal Heat Pump geothermal technology Ground Source Heat Pump GSHP GSHP Standard IGSHPA IGSHPA/GAOI IGSHPA 2025 IGSHPA conference Illinois Indiana Large Scale Thermal Projects Maine Massachusetts Michigan New Hampshire New York North Carolina Ohio Pennsylvania Practice Leader Public Review Rhode Island Senior Mechanical Engineer Service Technician South Carolina Tennessee train-the-trainer Vermont Virginia West Virginia

Archives

  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • May 2023
Copyright International Ground Source Heat Pump Association. All Rights Reserved.
IgshpaIgshpa

Confirmation

You are leaving the Exam. Do you want to continue to exit?