Skip to content
IgshpaIgshpa
  • Home
  • Pages
    • About IGSHPA
  • Courses
    • Geothermal Energy and Ground Source Heat Pumps – An Overview
    • GSHP Residential Service Technician Online Training Course – $400 Member Price*
    • GHSP Residential Installer Online Training Course – $400 Member Price*
    • Prerequisite Modules – Residential/Light Commercial GHXI (Ground Heat Exchanger Installer) – $345 Member Price*
    • Full Course – Residential/Light Commercial GHXI (Ground Heat Exchanger Installer) Course – $895 Member Price*
    • DOE Energy Skilled Recognition Courses – Member Price
    • DOE Energy Skilled Recognition Courses – Non-Member Price
    • Selecting a Ground Source Heat Pump Team
  • Contact
    • Contact Us
  • Shop
  • My Account
IgshpaIgshpa
  • Home
  • Pages
    • About IGSHPA
  • Courses
    • Geothermal Energy and Ground Source Heat Pumps – An Overview
    • GSHP Residential Service Technician Online Training Course – $400 Member Price*
    • GHSP Residential Installer Online Training Course – $400 Member Price*
    • Prerequisite Modules – Residential/Light Commercial GHXI (Ground Heat Exchanger Installer) – $345 Member Price*
    • Full Course – Residential/Light Commercial GHXI (Ground Heat Exchanger Installer) Course – $895 Member Price*
    • DOE Energy Skilled Recognition Courses – Member Price
    • DOE Energy Skilled Recognition Courses – Non-Member Price
    • Selecting a Ground Source Heat Pump Team
  • Contact
    • Contact Us
  • Shop
  • My Account

Doubled Verbs – Revision

  • Home
  • Quiz
  • Doubled Verbs – Revision
Breadcrumb Abstract Shape
Breadcrumb Abstract Shape
Breadcrumb Abstract Shape

Doubled Verbs – Revision

  • 18 Jan, 2024
  • Com 0

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.

Time limit: 0

Quiz Summary

0 of 35 Questions completed

Questions:

Information

You have already completed the quiz before. Hence you can not start it again.

Quiz is loading…

You must sign in or sign up to start the quiz.

You must first complete the following:

Results

Quiz complete. Results are being recorded.

Results

0 of 35 Questions answered correctly

Your time:

Time has elapsed

You have reached 0 of 0 point(s), (0)

Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)

Categories

  1. Not categorized 0%
  1. Review
  2. Answered
  3. Correct
  4. Incorrect
  1. Question 1 of 35
    1. Question

    In Summer, the GHX works by

    Correct
    Incorrect
  2. Question 2 of 35
    2. Question

    PPE (Personal Protective Equipment) required includes

    Correct
    Incorrect
  3. Question 3 of 35
    3. Question

    Closed loop GHX installation options include

    Correct
    Incorrect
  4. Question 4 of 35
    4. Question

    Surface water (pond/lake) GHXs may be installed, using

    Correct
    Incorrect
  5. Question 5 of 35
    5. Question

    For groundwater systems, most heat pump manufacturers require

    Correct
    Incorrect
  6. Question 6 of 35
    6. Question

    For groundwater system, on-site water chemistry

    Correct
    Incorrect
  7. Question 7 of 35
    7. Question

    According to C448, if the mean ground temperature is 50°F (10°C), the maximum design EWT for closed loop GHX systems is

    Correct
    Incorrect
  8. Question 8 of 35
    8. Question

    What is the primary purpose of a ground source heat pump system?

    Correct
    Incorrect
  9. Question 9 of 35
    9. Question

    Which type of ground loop requires the least amount of land area?

    Correct
    Incorrect
  10. Question 10 of 35
    10. Question

    The coefficient of performance (COP) of a ground source heat pump system is best described as

    Correct
    Incorrect
  11. Question 11 of 35
    11. Question

    The primary heat transfer medium used in most closed-loop ground heat exchanger systems is

    Correct
    Incorrect
  12. Question 12 of 35
    12. Question

    Which of these organizations developed the design and installation standards for ground source heat pump and district energy systems for commercial and residential buildings?

    Correct
    Incorrect
  13. Question 13 of 35
    13. Question

    What is the typical depth range of vertical boreholes for closed-loop GHX installations?

    Correct
    Incorrect
  14. Question 14 of 35
    14. Question

    The primary function of a desuperheater in a ground source heat pump system is to

    Correct
    Incorrect
  15. Question 15 of 35
    15. Question

    A ground source heat pump system’s efficiency decreases significantly if

    Correct
    Incorrect
  16. Question 16 of 35
    16. Question

    What is the expected lifespan of buried HDPE ground heat exchanger piping?

    Correct
    Incorrect
  17. Question 17 of 35
    17. Question

    Which is a major environmental safety concern in GHX drilling?

    Correct
    Incorrect
  18. Question 18 of 35
    18. Question

    In closed-loop GHX systems, purge carts are used to

    Correct
    Incorrect
  19. Question 19 of 35
    19. Question

    What is the primary purpose of pressure testing a ground heat exchanger before operation?

    Correct
    Incorrect
  20. Question 20 of 35
    20. Question

    If a GHX loop field design is undersized, the most likely result is

    Correct
    Incorrect
  21. Question 21 of 35
    21. Question

    What describes an open-loop system?

    Correct
    Incorrect
  22. Question 22 of 35
    22. Question

    Which ground heat exchanger type is most suitable for areas with limited land space?

    Correct
    Incorrect
  23. Question 23 of 35
    23. Question

    Which of the following close out document items should be submitted to the client upon project completion?

    Correct
    Incorrect
  24. Question 24 of 35
    24. Question

    From a safety perspective IGSHPA encourages ALL companies and workers to

    Correct
    Incorrect
  25. Question 25 of 35
    25. Question

    Which of the following is a potential job hazard if left uncontrolled?

    Correct
    Incorrect
  26. Question 26 of 35
    26. Question

    When working in or near shallow, deep, or unstable excavations what protective measures are critical to keeping workers safe when working in or near the trenches?

    Correct
    Incorrect
  27. Question 27 of 35
    27. Question

    Which of the following are the Basic 4 Tenants of Safety?

    Correct
    Incorrect
  28. Question 28 of 35
    28. Question

    When determining the feasibility of any type of GHX system which item is NOT required?

    Correct
    Incorrect
  29. Question 29 of 35
    29. Question

    What is the most important pre-construction item that must be reviewed prior to GHX final installation?

    Correct
    Incorrect
  30. Question 30 of 35
    30. Question

    Installation for specific ground source heat pump system applications shall be in accordance with the requirements of the AHJ and all parts of what document?

    Correct
    Incorrect
  31. Question 31 of 35
    31. Question

    Which closed-loop GHX design typically incurs minimal site impact and restoration requirements?

    Correct
    Incorrect
  32. Question 32 of 35
    32. Question

    What are common types of submerged surface water exchangers?

    Correct
    Incorrect
  33. Question 33 of 35
    33. Question

    For a groundwater open loop system (outside of the AHJ requirements), what 3 key items are the most important for the application?

    Correct
    Incorrect
  34. Question 34 of 35
    34. Question

    When designing or installing a groundwater system (outside of the AHJ requirements), the C448:25 standard requires a professional engineer/ or professional geologist with experience in GSHP systems for what type of application?

    Correct
    Incorrect
  35. Question 35 of 35
    35. Question

    When designing or installing a single-family groundwater system (outside of the AHJ requirements), the C448:25 standard requires the installation of test water wells, performance of aquifer tests, and test result evaluations be completed by?

    Correct
    Incorrect

Search

Categories

  • Blogs
  • Directory
  • Job Board
  • News

Categories

  • Blogs (8)
  • Directory (144)
  • Job Board (6)
  • News (14)

Tags

$10M Available 2025 conference annual conference C448 co-op training Connecticut CSA Design and Installation Standard District of Columbia electric co-op Engineer gaoi GAOI 2025 Georgia Geothermal Heat Pump geothermal technology Ground Source Heat Pump GSHP GSHP Standard IGSHPA IGSHPA/GAOI IGSHPA 2025 IGSHPA conference Illinois Indiana Large Scale Thermal Projects Maine Massachusetts Michigan New Hampshire New York North Carolina Ohio Pennsylvania Practice Leader Public Review Rhode Island Senior Mechanical Engineer Service Technician South Carolina Tennessee train-the-trainer Vermont Virginia West Virginia

Archives

  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • May 2023
Copyright International Ground Source Heat Pump Association. All Rights Reserved.
IgshpaIgshpa

Confirmation

You are leaving the Exam. Do you want to continue to exit?